|
|
TM 5-5420-279-23
6
SV-10
TPB1
TPB2
SV-9
SV-16
SV-8
SV-7
TPP
SV-5
SV-6
TPP2
TPB4
TPB7
TPB6
TPB8
2
1
5
686A882
View on left side
View on front
a.
Remove Sequence Valve
(1)
De-pressurize the hydraulic system. Refer to unit maintenance procedure 5-118.
(2)
Identify and locate the sequence valve (6) on the launch frame pilot manifold assembly (1).
(3)
Unscrew the sequence valve (6), counter-clockwise.
(4)
Remove the sequence valve (6) and its seal.
b.
Install Sequence Valve
(1)
Fit a new seal to the sequence valve (6).
(2)
Fit the sequence valve (6) to the launch frame pilot manifold assembly (1).
(3)
Check the operation of the launcher and check for leaks.
c.
Remove Pressure Reducing Valve
NOTE
This removal and replacement is applicable to both pressure reducing valves (2 and 5)
fitted to the launch frame pilot manifold assembly (1).
(1)
De-pressurize the hydraulic system. Refer to unit maintenance procedure 5-118.
(2)
Identify and locate the pressure-reducing valve (2 or 5) on the launch frame pilot manifold
assembly (1).
(3)
Remove the four screws (3).
(4)
Remove the pressure reducing valve (2 or 5).
(5)
Remove the four seals (4).
5-393
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |