Click here to make tpub.com your Home Page

Page Title: Table 5.1 Bridge Components PMCS - Parallel Module
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
Table 5.1 Bridge Components PMCS - Parallel Module
Fig No
PROCEDURES
REMARKS
a. Check the closing sling pulleys (A) for free rotation and
bent shafts.
b. Check the closing slings (B) for frayed or broken
strands and the end eyes for deformity.
c. Inspect the opening slings (C) for cuts and abrasions in
the outer sleeve.
d. Check that the opening sling securing pins (D) and
their roll pins are secure.
e. Examine the resilient mounts (E) for free rotation on
their shaft, and that they are secure and not damaged.
f. Examine the birds beak jaws (F) for cracks and
corrosion.
g. Check the torque setting caps on the jaw connection
system (G), to ensure that the Rotabolt torque settings
are at 880 lb/ft.
h. Check that the shoot bolts (H) are not bent or damaged
and that they are free to operate.
i. Check the hydraulic dampers (K) for leakage and
ensure that their mountings are secure.
j. Inspect for corrosion and cracking around all weld
areas.
k. Examine the curbs (L) for cracks, corrosion and
distortion. Check that the curbs are free to deploy and
that their locking catches (M) operate correctly.
l. Check the fatigue monitors for crack growth.
m. Check the bottom chords for impact or bearing
damage (lateral notches on bottom greater than 1/4 inch
(6mm).
n. Check the roadway surfaces for signs of damage.
o. Check all components for damage to protective paint
film.
5-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business