5-11 BRIDGE COMPONENTS PMCS
The PMCS to be carried out on the Bridge Components are shown in Tables 5.1 to 5.5.
5-12 LAUNCHER COMPONENTS PMCS
The PMCS to be carried out on the Launcher Components are shown in Tables 5.6 to 5.24.
5-13 CRANE COMPONENTS PMCS
The PMCS to be carried out on the Launcher Components are shown in Table 5.25.
5-14 TAIL LIFT COMPONENTS PMCS
The PMCS to be carried out on the Launcher Components are shown in Table 5.26 to 5.27.
5-15 PMCS REPORTING
The loose-leaf illustrations Fig 5.13 to 5.39 are to be copied and used to report component
damage. When damage is observed the inspector is to mark the damaged area on a copy of the
illustration. For cross-reference, the condition and the grid reference is to be recorded. Full details
of the damage, such as lengths and widths of cracks and degree of distortion etc. must be
recorded. The completed illustration is to accompany DA form 2404. Equipment Inspection and
Maintenance Worksheet.