|
|
TM 5-5420-279-23
TSUM - 2-003 A-Frame Rotate (Deploy) (17) Part 2
Part 2
Operator
Maintainer
Tasks
Tasks
Is
LED on SV19b
Carry out electrical
on A-fram e Rotate
trouble shooting
Manifold illum inated when A
No
chapter 3 procedure
Fram e Rotate Deploy Button
3-002
pressed
on Operator
Panel
Yes
Check that LED
on SV16 on
Launch Fram e
Pilot Manifold is
illum inated when
Rotate Deploy
Button is pressed
CAUTION
Ensure A Fram e Rotate
Deploy button is held
depressed or m anual
Operate SV19b
operation of SV16 is carried
m anually
out while SV19b is operated.
NOTE CAUTION
Dam age to Stowing Cylinders
or Articulation Cylinders m ay
arise if this is not carried out.
Does
Yes
Replace solenoid
A-Fram e
SV19b. See
rotate when SV19b is
m aintenance
m anually
procedure 5-124
operated
No
Fit a pressure
gauge to TPA1 on
A-Fram e Rotate
m anifold
Manually operate
SV19b
NOTE CAUTION
Go to
Part 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |