Click here to make tpub.com your Home Page

Page Title: TSUM - 2-003 A-Frame Rotate (Deploy) (17) Part 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
TSUM - 2-003 A-Frame Rotate (Deploy) (17) Part 1
A-Fram e does not rotate when
A-Fram e Rotate Deploy button
on Operator Panel is pressed
Operator
Maintainer
Tasks
Tasks
Is
Com plete Deploym ent -
A-Fram e
Check Lim it Switches.
Fold Deployed
Carry out electrical trouble
No
light illum inated on the
shooting chapter 3
Operator
procedure 3-002
Panel
Yes
Is
the A-Fram e Rotate
Carry out electrical trouble
Deploy light illum inated
shooting chapter 3
No
on the Operator
procedure 3-002
Panel
Yes
Does
A-Fram e rotate when
A-Fram e Rotate Deploy
Yes
Problem Resolved
button is pressed on
Operator Panel
No
Is SV19b LED
Carry out electrical trouble
illum inated on Operator Panel
shooting chapter 3
No
when A-Fram e Rotate Deploy
procedure 3-002
button is pressed
Yes
Go to
Part 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business