Set STARTER TEST switch (1) to OFF position.
1.
2. Turn STARTER VOLTAGE knob (2) to the left.
3. Set all LOAD BANK switch (3) to OFF position.
4. Set MASTER LOAD switch (4) to OFF position.
5. Turn FIELD CURRENT RHEOSTAT (5) to the left.
I
6. Turn VARIABLE LOAD (6) to the left.
7. Turn POWER SUPPLY (7) to the left.
8. Set CHARGE TIMER (8) to OFF position.
9. Turn BATTERY CHARGER control (9) to the left.
10. Turn 400A CONTROL BOX VOLTAGE ADJUST knob (10) to the left.
END OF TASK