Click here to make tpub.com your Home Page

Page Title: FRAME 7
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-210-34-2-2
FRAME 7
L a y a straight edge (1) along line A on gasket surface of cylinder head (2).
1.
U s i n g feeler gage, check that gasket surface of cylinder head is not out-of-
flat crosswise.
2.
I f gasket surface of cylinder head (2) is more than 0.003 inch out-of-flat
crosswise, get a new cylinder head.
If gasket surface is out-of-flat by less
t h a n 0.003 inch crosswise, tag cylinder head for resurfacing by reaching shop.
NOTE
Cylinder head (2) may have been resurfaced before. If
c y l i n d e r head was resurfaced before, amount of metal
m a c h i n e d off will be stamped on front of cylinder head
a b o u t 1/2 inch from gasket surface of cylinder head.
N o more than 0.005 inch can be machined off. If 0.005
i n c h has already been machined off and cylinder head
needs resurfacing, get a new cylinder head.
L a y straight edge (1) along line B on gasket surface of cylinder head (2).
3.
Do steps 1 and 2 again.
L a y straight edge (1) along line C on gasket surface of cylinder head (2).
4.
Do steps 1 and 2 again.
L a y straight edge (1) along line D on gasket surface of cylinder head (2).
5.
Do steps 1 and 2 again.
GO TO FRAME 8
4-217

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business