Click here to make tpub.com your Home Page

Page Title: STE/ICE-R CABLE ASSEMBLY REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
7-65. STE/ICE-R CABLE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Instrument panel assembly removed for access (para
Ties, Cable, Plastic (Item 69, Appendix D)
7-15).
Lockwasher (4) (Item 76, Appendix G)
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
a. Removal.
NOTE
Remove plastic cable ties as required.
(1) Disconnect connector J31X (1) from connector P31X (2).
(2) Disconnect connector J43X (3) from connector P43X (4).
(3) Remove two screws (5) and bracket (6) from cab (7).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business