|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Batteries disconnected (para 7-57).
Ties, Cable, Plastic (Item 69, Appendix D)
Kick panel removed (para 16-3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
a. Removal.
NOTE
Note routing of chemical alarm kit cable prior to
removal.
Remove plastic cable ties as required.
(1) Disconnect connector J99 (1) from connector P99 (2).
(2) Remove chemical alarm kit cable assembly (3) from
vehicle.
b. Installation.
NOTE
Install plastic cable ties as required.
Connect connector P99 (2) to connector J99 (1) and route
chemical alarm kit cable assembly (3).
c. Follow-On Maintenance.
(1) Install kick panel (para 16-3).
(2) Connect batteries (para 7-57).
End of Task.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |