|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Personnel heater removed (para 18-9).
Dispenser, Pressure Sensitive Adhesive Tape
(Item 20, Appendix D)
Ties, Cable, Plastic (Item 69, Appendix D)
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
a. Removal.
NOTE
Remove plastic cable ties as required.
Tag wires and connection points prior to
disconnecting.
(1) Disconnect connector J108 (1) from connector P108 (2).
(2) Disconnect connector J210 (3) from connector P210 (4).
(3) Disconnect connector P913 (5) from connector J913 (6).
(4) Disconnect connector P912 (7) from connector J912 (8).
(5) Remove auxiliary panel cable assembly (9) from
dashboard (10).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |