Click here to make tpub.com your Home Page

Page Title: Installation (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
(4) Install battery 24 vdc cable (10) on battery terminals BT1
E1 (11) and BT2 E1 (12).
(5) Tighten two terminal screws (13) on battery 24 vdc cable
(10).
(6) Install terminal lugs TL10 (14), TL39 (15) on battery 24
vdc cable (10) with nut (16).
WARNING
Negative  battery  terminals  must  be
connected last.  Failure to comply may
result in serious injury or death to
personnel.
(7) Install battery tester terminal lug (17) and terminal lug
TL49A (18) on battery 24 vdc cable (10).
(8) Deleted.
(9) Install nut (20) on battery 24 vdc cable (10).
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business