|
|
TM 9-2320-366-20-3
(27) Install quick disconnect terminal (55) on ground strip (12)
position 20.
(28) Install terminal lug (56) on terminal block (17) position 19
with screw (57).
(29) Close cover (58) on junction box (1).
(30) Tighten four screws (59) on junction box (1).
e. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate crane and check all crane functions (TM 9-
2320-366-10-1).
End of Task.
7-179
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |