|
|
TM 9-2320-366-20-3
(19) Install quick disconnect terminals (38) on ground strip
(12) positions 14 and 15.
(20) Install crane power cable (39) in junction box (1) with
four screws (40), lockwashers (41), and nuts (42).
(21) Install quick disconnect terminal (43) on ground strip (12)
position 2.
(22) Install three terminal lugs (44) on terminal block (17)
positions 2 through 4 with three screws (45).
7-177
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |