Click here to make tpub.com your Home Page

Page Title: Installation. (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
7-10. WTEC II DASHBOARD CABLE ASSEMBLY REPLACEMENT/REPAIR (CONT)
(5) Install relay K15 (6) on PDP (2).
NOTE
Perform steps (6) and (7) on M1084/
M1086/M1088 and M1089.
(6) Install circuit breaker CB72 (7) on PDP (2).
(7) Install relay K12 (8) on PDP (2).
NOTE
Step (8) requires the aid of an assistant.
Install plastic cable ties as required.
(8) Position WTEC II dashboard cable assembly (9) in
dashboard (10).
(9) Install terminal lug TL14 (11) on terminal board TB2 (12)
position 12.
(10) Install terminal lug TL87 (13) on terminal board TB2 (12)
position 6.
(11) Remove two nuts (14), lockwashers (15), washers (16),
cover (17), and two washers (16) from terminal board
TB1 (18).
(12) Install terminal lug TL75 (19) on terminal board TB1 (18)
position 2.
(13) Install terminal lug TL71 (20) on terminal board TB2 (12)
position 2.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business