|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
d. Installation
b. Disassembly
e. Follow-On Maintenance
c. Assembly
INITIAL SETUP
Equipment Conditions
Materials/Parts
Batteries disconnected (para 7-57).
Dispenser, Pressure Sensitive Adhesive Tape
(Item 20, Appendix D)
Tools and Special Tools
Decal (Item 11, Appendix G)
Tool Kit, Genl Mech (Item 46, Appendix C)
Nut, Self-Locking (2) (Item 131, Appendix G)
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
a. Removal
(1) Remove six screws (1) from auxiliary panel (2).
(2) Lift auxiliary panel (2) outward from auxiliary panel
housing (3) to gain access.
NOTE
Tag electrical connectors and connection
points prior to removal.
All rocker switches are removed the same
way. PTO switch shown
(3) Lift tab (4) on connector P904 (5).
(4) Disconnect connector P904 (5) from PTO switch (6).
(5) Disconnect connector P904A (7) from PTO switch
(6).
Change 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |