|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine shut down (TM 9-2320-366-10-1).
Antifreeze, Ethylene Glycol, Permanent (Item 12,
Cab raised (TM 9-2320-366-10-1).
Tools and Special Tools
Pan, Drain (Item 24, Appendix C)
Tool Kit, Genl Mech (Item 46, Appendix C)
a. Removal.
(1) Position drain pan under air compressor (1).
(2) Disconnect air compressor inlet coolant tube (2) from air
compressor (1).
(3) Disconnect air compressor inlet coolant tube (2) from
water pump (3).
(4) Remove air compressor inlet coolant tube (2) from
vehicle.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |