|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine shut down (TM 9-2320-366-10-1).
Antiseize Compound (Item 58, Appendix D)
Cab raised (TM 9-2320-366-10-1).
Antifreeze, Ethylene Glycol, Permanent (Item 12,
Batteries disconnected (para 7-57).
Tools and Special Tools
Pan, Drain (Item 24, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B)
WARNING
Coolant may be very hot and under
pressure from engine operation. Ensure
engine is cool before performing
maintenance.
Failure to comply may
result in injury to personnel.
a. Removal.
(1) Remove radiator cap (1) from radiator overflow tank (2).
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
(2) Position drain pan under radiator (3).
(3) Open radiator draincock (4) and drain approximately one
gallon of coolant.
(4) Close radiator draincock (4).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |