|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools (Cont)
Engine shut down (TM 9-2320-366-10-1).
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Socket Set, Socket Wrench (Item 36, Appendix C)
Tools and Special Tools
Goggles, Industrial (Item 15, Appendix C)
Container (10 gal (38 L) capacity)
Materials/Parts
Tool Kit, Genl Mech (Item 46, Appendix C)
Ties, Cable, Plastic (Item 69, Appendix D)
WARNING
Coolant may be very hot and under
pressure from engine operation. Ensure
engine is cool before performing
maintenance.
Failure to comply may
result in injury to personnel.
a. Removal.
(1) Remove radiator cap (1) from radiator overflow tank (2).
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
(2) Position container under radiator draincock (3).
(3) Open radiator draincock (3) and drain approximately five
gallons (19 L) of coolant.
(4) Close radiator draincock (3).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |