|
|
TM 9-2320-366-20-3
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine shut down (TM 9-2320-366-10-1).
Antiseize Compound (Item 58, Appendix D)
Cab raised (TM 9-2320-366-10-1).
Antifreeze, Ethylene Glycol, Permanent (Item 12,
Batteries disconnected (para 7-57).
Nut, Self-Locking (Item 128, Appendix G)
Tools and Special Tools
Goggles, Industrial (Item 15, Appendix C)
Container (52 qt (50 L) capacity)
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B)
WARNING
Coolant may be very hot and under pressure
from engine operation. Ensure engine is
cool before performing maintenance. Failure
to comply may result in injury to personnel.
Wear appropriate eye protection when
working under vehicle due to the possibility
of falling debris. Failure to comply may
result in injury to personnel.
a. Removal.
(1) Remove radiator cap (1) from radiator overflow tank (2).
(2) Position container under radiator (3).
(3) Open radiator draincock (4) and drain coolant.
(4) Close radiator draincock (4).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |