|
|
TM 9-2320-366-20-3
WARNING
Wear protective goggles to protect against
possible injury from release of high pressure
air. Failure to comply may result in injury to
personnel.
NOTE
Tag air hose and connection point prior to
disconnecting
AIR PRESSURE TEST STE/ICE-R TEST #50
(1) Connect M1089 30K winch test adapter to
input fitting.
(2) Connect air hose to M1089 30K winch test
adapter.
(3) Install STE/ICE-R 0-1000 PSI transducer in
M1089 30K winch test adapter.
(4) Start engine (TM9-2320-366-10-1) and
allow vehicle to build air pressure.
(5) Perform STE/ICE-R Test #50 and note
reading on STE/ICE-R.
(6) If 75-120 PSI (518-827 kPa) is not present,
notify DS Maintenance to repair or replace
M1089 30K winch manifold assembly.
(7) If 75-120 PSI (518-827 kPa) is present,
repair or replace M1089 30K winch
pneumatic manifold assembly (para 17-29).
(8) Shut down engine (TM 902320-366-10-1).
(9) Drain air tanks (TM9-2320-366-10-1).
(10) Remove STE/ICE-R 0-1000 PSI transducer
from M1089 30K winch test adapter.
(11) Disconnect air hose from M1089 30K
winch test adapter.
(12) Disconnect M1089 30K winch test adapter
from input fitting.
(13) Connect air hose to input fitting on M1089
30K winch manifold assembly.
(14) Close LH and RH catwalks.
(15) Install wrecker control panel top cover
(para 14-4).
Change 1
2-2428.7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |