CONTINUITY TEST
(1) Remove circuit breaker CB5 from Power
Distribution Panel (PD1).
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter to
one terminal of circuit breaker CB5.
(4) Connect negative (-) probe of multimeter to
other probe of circuit breaker CB5 and note
reading on multimeter.
(5) If continuity is not present, replace circuit
breaker CB5 (para 20-80).
(6) If continuity is present, perform Special
Purpose Kit Troubleshooting task x1. No
Power to Digitization Rack.
NOTE
Perform steps (7) through (10), if continuity
is present through circuit breaker CB5.
(7) Install circuit breaker CB5 in Power
Distribution Panel (PD1)
(8) Position electrical distribution block cover on
power distribution shelf.
(9) Tighten wing nut on electrical distribution
block cover.
(10) Install wing screw on power distribution shelf.
Change 2
2-2291
|