Click here to make tpub.com your Home Page

Page Title: RESISTANCE TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
RESISTANCE TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter
to connector P119. Refer to Table 2-25.
Transmission Solenoid F and G Resistance
Test Points.
(3)
Connect negative (-) probe of multimeter to
connector P119 and note reading on
multimeter. Refer to Table 2-25.
Transmission Solenoid F and G Resistance
Test Points.
(4)
Connect negative (-) probe of multimeter to
all other pins in connector P119, one at a
time, and note reading on multimeter.
(5)
Connect negative (-) probe of multimeter to
ground and note reading on multimeter.
(6)
If good resistance is not noted in step 3, or
continuity is present in step 4 or step 5,
transmission harness external wiring
harness may be faulty, notify DS
Maintenance.
(7)
If good resistance is noted in step 3, and
continuity is not present in step 4 or step 5,
replace WTEC II TEPSS (para 8-2).
(8)
Connect connector P119 to connector J119.
(9)
Position front grille on cab with washer and
screw.
(10)
Position two washers and screws in front
grille.
(11)
Tighten screw to 48-60 lb-in. (5-7 Nm).
(12)
Tighten two screws to 24 lb-in. (3 Nm).
(13)
Connect connectors J114 and J115 to
WTEC II TEPSS.
(14)
Install instrument panel assembly (para 7-15).
(15)
Clear diagnostic codes (para 8-4).
Table 2-25. Transmission Solenoids F and G
Resistance Test Points
Sub
Affected
Connector
Connector
Code
Solenoid
P119 High
P119 Low
21
F
F
H
26
N
K
A
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business