Click here to make tpub.com your Home Page

Page Title: VOLTAGE TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
VOLTAGE TEST
(1)
Remove personnel heater to gain access
(para 18-9).
(2)
Disconnect connector P913 from connector
J913.
(3)
Set multimeter to ohms.
(4)
Connect positive (+) probe of multimeter to
connector J913-1.
(5)
Connect negative (-) probe of multimeter to
PDP, relay K12 socket 86 and note reading on
multimeter.
(6)
If continuity is not present, repair wire 1673
(para 2-45) or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(7)
If continuity is present, repair wire 1673
(para 2-45) or replace auxiliary panel cable
assembly (para 7-58).
(8)
Connect connector P913 to connector J913.
(9)
Install relay K12 in PDP.
(10)
Install personnel heater (para 18-9).
(11)
Connect connector P906 to blackout override
switch.
(12)
Position auxiliary panel on auxiliary panel
housing with six screws.
(13)
Tighten six screws to 24 lb-in. (3 Nm).
2-1575

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business