|
|
TM 9-2320-366-20-2
TM
VOLTAGE TEST
(1)
Remove personnel heater to gain access
(para 18-9).
(2)
Disconnect connector P913 from connector
J913.
(3)
Set multimeter to ohms.
(4)
Connect positive (+) probe of multimeter to
connector J913-1.
(5)
Connect negative (-) probe of multimeter to
PDP, relay K12 socket 86 and note reading on
multimeter.
(6)
If continuity is not present, repair wire 1673
(para 2-45) or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(7)
If continuity is present, repair wire 1673
(para 2-45) or replace auxiliary panel cable
assembly (para 7-58).
(8)
Connect connector P913 to connector J913.
(9)
Install relay K12 in PDP.
(10)
Install personnel heater (para 18-9).
(11)
Connect connector P906 to blackout override
switch.
(12)
Position auxiliary panel on auxiliary panel
housing with six screws.
(13)
Tighten six screws to 24 lb-in. (3 Nm).
2-1575
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |