TM 9-2320-366-20-2
VOLTAGE TEST
(1) Set multimeter to ohms.
(2) Remove diode D2B from PDP.
(3) Connect positive (+) probe of multimeter to
PDP, where relay K9 terminal 87 was
removed.
(4) Connect negative (-) probe of multimeter to
PDP, where diode D2B terminal 4 was
removed and note reading on multimeter.
(5) If continuity is not present, repair wire 1565
from relay K9 terminal 87 to diode D2B
terminal 4 (para 2-45) or replace WTEC II
dashboard cable assembly (para 7-10) or
WTEC III dashboard cable assembly
(para 7-11).
(6) If continuity is present, replace relay K9
(para 7-9).
(7) Install relay K9 in PDP.
(8) Install diode D2B in PDP.
(9) Install PDP cover (para 16-2).
(10) Connect connector P905 to worklights
switch.
(11) Position auxiliary panel on auxiliary
panel housing with six screws.
(12) Tighten six screws to 24 lb-in. (3 Nm).
Change 1
2-1555
|