Click here to make tpub.com your Home Page

Page Title: M1089 MATERIAL HANDLING CRANE (MHC) TELESCOPE IN DOES NOT OPERATE FROM REMOTE STATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
e126. M1089 MATERIAL HANDLING CRANE (MHC) TELESCOPE IN DOES NOT
OPERATE FROM REMOTE STATION
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Outriggers lowered (TM 9-2320-366-10-1).
Tool Kit, Genl Mech (Item 46, Appendix C)
Crane erected with approximately five feet
Multimeter, Digital (Item 22, Appendix C)
of cable payed out (TM 9-2320-366-10-1).
STE/ICE-R (Item 41, Appendix C)
Engine shut down (TM 9-2320-366-10-1).
References
Personnel Required
TM 9-4910-571-12&P
(2)
START
WARNING
KNOWN INFO
TEST OPTIONS
Read WARNING
1.
Other crane functions from
Voltage Test or
on following page.
remote station OK.
STE/ICE-R Test #89
Is 24 vdc present at
POSSIBLE PROBLEMS
REASON FOR QUESTION
junction box assembly
Faulty telescope in
This question eliminates
terminal board position 12?
solenoid cable.
possible problems and
Faulty telescope in
determines where to
continue troubleshooting.
Faulty TELESCOPE IN/OUT
controller.
Faulty remote control
NO
box internal wiring
harness.
Faulty external remote
control cable.
Faulty remote control
Go to step 3 of this fault.
cable.
YES

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business