|
|
TM 9-2320-366-20-2
TM
OPERATE FROM REMOTE STATION
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
Outriggers lowered (TM 9-2320-366-10-1).
Tool Kit, Genl Mech (Item 46, Appendix C)
Crane erected with approximately five feet
Multimeter, Digital (Item 22, Appendix C)
of cable payed out (TM 9-2320-366-10-1).
STE/ICE-R (Item 41, Appendix C)
Engine shut down (TM 9-2320-366-10-1).
References
Personnel Required
TM 9-4910-571-12&P
(2)
START
WARNING
KNOWN INFO
TEST OPTIONS
Read WARNING
1.
Other crane functions from
Voltage Test or
on following page.
remote station OK.
STE/ICE-R Test #89
Is 24 vdc present at
POSSIBLE PROBLEMS
REASON FOR QUESTION
junction box assembly
Faulty hoist down solenoid
This question eliminates
terminal board position 24?
cable.
possible problems and
Faulty hoist down
determines where to
continue troubleshooting.
Faulty HOIST UP/DOWN
controller.
Faulty remote control
NO
box internal wiring
harness.
Faulty external remote
control cable.
Faulty remote control
Go to step 3 of this fault.
cable.
YES
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |