|
|
TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
PDP, terminal 85, where relay K19 was
removed.
(3)
Connect negative (-) probe of multimeter to
ground and note reading on multimeter.
(4)
If continuity is not present, repair wire 3016
(para 2-45) or replace WTEC II dashboard
cable assembly (para 7-10) or WTEC III
dashboard cable assembly (para 7-11).
(5)
If continuity is present, replace relay K19
(para 7-9).
(6)
Install relay K19 in PDP.
(7)
Install PDP cover (para 16-2).
2-1141
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |