|
|
TM 9-2320-366-20-2
TM
INITIAL SETUP
Equipment Condition
Tools and Special Tools
Engine shut down (TM 9-2320-366-10-1).
Tool Kit, Genl Mech (Item 46, Appendix C)
STE/ICE-R (Item 41, Appendix C)
Multimeter, Digital (Item 22, Appendix C)
Personnel Required
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
(2)
Materials/Parts
References
Wire, Elect, 50 ft (Item 71, Appendix D)
TM 9-4910-571-12&P
Wire, Relay Test (Item E-9, Appendix E)
START
WARNING
Read WARNING
KNOWN INFO
TEST OPTIONS
1.
on following page.
Circuit breaker OK.
Voltage Test or
Vehicle starts.
STE/ICE-R #89
POSSIBLE PROBLEMS
Is 24 vdc present at
REASON FOR QUESTION
connector P217-B?
Faulty PTO cable
This question helps
assembly.
eliminate possible
Faulty PTO.
problems and determines
Faulty dashboard cable
where troubleshooting
assembly.
continues.
NO
Faulty auxiliary panel
cable assembly.
Faulty PTO switch.
Faulty WTEC II VIM.
YES
Go to step 3 of this fault.
Faulty WTEC II relay SF02.
Faulty WTEC III relay K37.
Faulty WTEC III
transmission ECU.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |