|
|
TM 9-2320-366-20-1
CONTINUITY TEST
(1) Set multimeter to ohms.
(2) Connect positive (+) probe of multimeter
to PDP, terminal 85, where relay K9 was
removed.
(3) Connect negative (-) probe of multimeter to
ground and note reading on multimeter.
(4) If continuity is not present, repair wire
1565 from relay K9 terminal 85 to
terminal board TB2 position 56 (para 2-45)
or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III
dashboard cable assembly (para 7-11).
CAUTION
Use care when testing electrical connectors.
Do not damage connector pins or sockets
with multimeter probes. Failure to comply
may result in damage to equipment.
CONTINUITY TEST
(1) Set multimeter to ohms.
(2) Connect positive (+) probe of multimeter
to PDP, terminal 87, where relay K9 was
removed.
(3) Connect negative (-) probe of multimeter
to connector PX14 socket 2.
(4) If continuity is not present, repair wire
1565 from relay K9 terminal 87 to
connector PX14 socket 2 (para 2-45) or
replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III
dashboard cable assembly (para 7-11).
(5) If continuity is present, replace relay
K9 (para 7-9).
(6) Connect connector PX14 to hazard
lights switch.
(7) Install relay K9 in PDP.
(8) Install PDP cover (para 16-2).
(9) Install instrument panel assembly
(para 7-15).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |