|
|
TM 9-2320-366-20-1
CONTINUITY TEST
(1) Remove relay K8 from PDP.
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter
to PDP terminal 87, where relay K7 was
removed.
(4) Connect negative (-) probe of multimeter
to PDP terminal 30, where relay K8 was
removed and note reading on multimeter.
(5) If continuity is not present, repair wire
1417 from PDP relay K7 terminal 87 to
PDP relay K8 terminal 30 (para 2-45) or
or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III
dashboard cable assembly (para 7-11).
(6) Install relay K7 in PDP.
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter
to relay K8 terminal 87A.
(3)
Connect negative (-) probe of multimeter
to relay K8 terminal 30 and note reading
on multimeter.
(4)
If continuity is not present, replace relay
K8 (para 7-9).
(5)
If continuity is present, replace relay
K7 (para 7-9).
(6)
Install relay K8 in PDP.
(7)
Install PDP cover (para 16-2).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |