Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
CONTINUITY TEST
(1) Set multimeter to ohms.
CAUTION
When testing to terminal X1 on PDP,
ensure that multimeter probes come in
contact with the outside metal ring.
Failure to comply may result in false
troubleshooting test results.
(2) Connect positive (+) probe of multimeter
to terminal X1 on PDP.
(3) Connect negative (-) probe of multimeter to
terminal lug TL44 and note reading on
multimeter.
(4) If continuity is not present, replace 200
AMP terminal block to PDP 24 VDC cable
(para 20-57).
(5) If continuity is present, replace 200 AMP
reverse polarity relay (para 20-47).
(6) Position terminal lug TL44 on left 24V
LOAD terminal stud on 200 AMP terminal
block with washer, lockwasher, and nut.
(7) Tighten nut to 15-19 lb-ft (21-25 N.m)
(8) Position dust boot on left 24V LOAD
terminal stud on 200 AMP terminal block.
(9) Install PDP cover (para 16-2).
(10) Connect batteries (para 7-57).
(11) Raise spare tire (TM 9-2320-366-10-2).
All data on pages 286 through 309,
including pages 287 through 308 deleted.
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business