|
|
TM 9-2320-366-20-1
CONTINUITY TEST
(1) Disconnect batteries (para 7-57).
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter to
solenoid left terminal stud.
(4) Connect negative (-) probe of multimeter to
starting motor ground terminal stud and note
reading on multimeter.
(5) If continuity is not present repair or replace
ground wire from solenoid left terminal stud
to starting motor ground terminal stud
(para 2-45).
Change 1
2-167
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |