Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
(3)
Install two grommets (9), insulator (10), and
spring clip (11), on warning light assembly (3).
(4)
Attach three sockets (12) and (13) to power
cord (2).
(5)
Attach socket housing (14) to wires (15).
(6)
Install two grommets (16) and preformed packing
(17) on power supply (18).
(7)
Plug three sockets (12) and (13) into socket
housing (14) and attach power supply (18) to
warning light assembly (3) using three
screws (19).
(8)
Attach flash tube assembly (20) to power supply
(18) using plug connection (21) and two screws (22).
(9)
Attach lens (23) to warning light assembly (3)
using two screws (24).
Follow-on Maintenance. Check operation of beacon light (TM 9-2320-279-10).
c.
END OF TASK
Change 5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business