Click here to make tpub.com your Home Page

Page Title: ENGINE CIRCUIT BREAKER REMOVAL/INSTALLATION.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
ENGINE CIRCUIT BREAKER REMOVAL/INSTALLATION.
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
References
All
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
TM 9-2320-279-10 Engine side panel
Special Tools
removed.
None
Batteries disconnected.
Supplies
Special Environmental Conditions
Sealant, RTV200 Electrical, Item 45.05,
None
Appendix C
Tags, identification, Item 48, Appendix C
General Safety Instructions
Personnel Required
None
MOS 63S, Heavy wheel vehicle mechanic
a.
Removal.
NOTE
Tag and mark wires before removing.
(1)
Remove two screws (1), lockwashers (2), and wires (3, 3.1, and 4) from circuit breaker (5).
Change 5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business