Click here to make tpub.com your Home Page

Page Title: Installation (M985E1)-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-11.
ENGINE HIGH IDLE BOX, CONNECTOR, SWITCHES, AND BRACKET
REMOVAL/INSTALLATION (CRANE MOUNTED) (M984, M985E1) (CONT).
(11)
Install two nuts (30) on ON/OFF
switch (20) and LATCH switch (23).
(12)
Install ON/OFF switch (20) and
LATCH switch (23) in cover (29) with
two lockwashers (31) and nuts (32).
NOTE
Vehicles that have a CRANE
OUTRIGGERS EXTENDED indicator
relay have three wires. Vehicles that do not
have a CRANE OUTRIGGERS
EXTENDED indicator relay have two
wires.
(13)
Install screw (33), relay (26),
lockwasher (34), wires (35), and
locknut (36) on cover (29).
NOTE
Some vehicles have a CRANE
OUTRIGGERS EXTENDED indicator
relay. Others do not. For vehicles that
have a CRANE OUTRIGGERS
EXTENDED indicator relay, do
step (13.1).
(13.1) Install screw (36.1), CRANE
OUTRIGGERS EXTENDED indicator
relay (26.3), lockwasher (36.2), and
locknut (36.3) on cover (29).
Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business