Click here to make tpub.com your Home Page

Page Title: ENGINE HIGH IDLE BOX, CONNECTOR, SWITCHES, AND BRACKET REMOVAL/INSTALLATION (CRANE MOUNTED) (M984, M985E1).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-10.
ENGINE HIGH IDLE BOX REMOVAL/REPAIR/INSTALLATION
(M977, M985) (CONT).
d.
Installation.
(1)  Install ENGINE HIGH IDLE box (1) on
fender (2) with four screws (3),
lockwashers (4), and nuts (5).
(2)  Connect connector (6) to connector (7).
(3) Deleted.
e.
Follow-on Maintenance
(1)  Connect batteries (para 7-91).
(2)  Check operation of LATCH and
ON/OFF SWITCHES.
(TM 9-2320-279-10).
END OF TASK
ENGINE HIGH IDLE BOX, CONNECTOR, SWITCHES, AND BRACKET
REMOVAL/INSTALLATION (CRANE MOUNTED) (M984, M985E1).
This task covers:
a. Removal (M984)
d. Installation (M985E1)
b. Installation (M984)
e. Follow-on Maintenance
c. Removal (M985E1)
INITIAL SETUP
Personnel Required
MOS 63S, Heavy wheel vehicle mechanic
Models
M984, M985E1
References
Test Equipment
None
None
Equipment Condition
Special Tools
TM or Para
Condition Description
None
Batteries disconnected.
Supplies
Connector, electrical, butt, Item 19,
Special Environmental Conditions
Appendix C
None
Tags, indentification, Item 48, Appendix C
Compound, sealing, pipe thread, Item 18,
General Safety, Instructions
Appendix C
None
Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business