TM 9-2320-279-20-1
Troubleshooting Malfunctions (Cont)
Table 2-9. Troubleshooting (Cont)
Malfunction
Test or Inspection
Corrective Action
Check ENGINE START switch for loose or damaged connections.
Step 7.
Tighten loose connections or repair damaged connections.
Check ENGINE START switch for 22-28 volts at BAT terminal with ENGINE switch OFF.
Step 8.
If no voltage, check circuit breaker No. 5 (step 10).
Check output side of circuit breaker No. 5 for 22-28 volts (fig. 2-2).
Step 9.
If voltage is 22-28 volts, harness is bad. Notify the supervisor.
Check input side of circuit breaker No. 5 for 22-28 volts (fig. 2-2).
Step 10.
If voltage is 22-28 volts, replace circuit breaker 5 (para 7-43).
Check ENGINE START switch for 22-28 volts at ST terminal with ENGINE START switch
Step 11.
to START.
If no voltage, replace ENGINE START switch (para 7-37).
Check neutral safety switch adjustment.
Step 12.
Replace neutral safety switch if not working or cannot be adjusted (para 8-4).
2-61