Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Level Preventive Maintenance Checks And Services-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Table 2-1. Unit Level Preventive Maintenance Checks and Services
Not Mission
Procedure
Item To Be
Interval
Item
Capable If:
Inspected
No
NOTE
M977 and
M985
Load testing of cranes is required before initial
Crane
use of all new cranes, cranes that have been
extensively repaired, cranes that have under-
gone modification or alteration, and cranes
that have remained idle six or more months.
Crane does not meet load
Refer crane to next higher level of mainte-
test requirements.
nance for load testing.
NOTE
Lift Cylin-
Semi-
1
der Pivot
Annual
Purging of lubricant.
When using a grease gun, apply lubricant to
the fitting until clean lubricant squeezes out
of the fitting being lubricated.
Fittings will not purge
Lubricate both ends of lift cylinders with GAA.
old lubricant out of com-
ponent.
Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business