Click here to make tpub.com your Home Page

Page Title: Replacement.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-4
g.
Replacement.
FRAME 1
WARNING
S m o k i n g , sparks or open flames are not allowed within
5 0 feet of work area during this task. Fuel can explode,
c a u s i n g injury to personnel and damage to equipment.
1.
W o r k i n g in battery box, put heater assembly (1) into two retainer clamps (2).
C l o s e and screw tight two retainer clamps (2).
P l u g in and screw on tight electrical connector (3).
2.
3.
Slide exhaust pipe elbow (4) onto heater (1). Put in cotter pin (5). Bend
over ends of cotter pin (5).
4.
P u t fuel line (6) on fuel control valve (7). Screw on and tighten fitting (8).
5.
T u r n on fuel cock (9).
NOTE
Follow-on Maintenance Action Required:
1.
P u t on coolant hoses at heater. Refer to
T M 9-2320-211-20.
2.
P u t on battery ground strap. Refer to
T M 9-2320-211-20.
3.
O p e r a t e heater and check for coolant and fuel
l e a k s .  R e f e r to TM 9-2320-211-10.
END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business