|
|
TM 9-2320-211-34-2-4
M A T E R I A L USED IN CONJUNCTION WITH MAJOR ITEMS
GROUP MAINTENANCE
Section I. SCOPE
19-1. EQUIPMENT ITEMS COVERED. T h i s chapter gives equipment maintenance
p r o c e d u r e s for winterization and special purpose kits for which there are authorized
c o r r e c t i v e maintenance tasks at the direct and general support maintenance levels.
19-2. EQUIPMENT' ITEMS NOT COVERED. A l l equipment items for which corrective
m a i n t e n a n c e is authorized at the direct and general support maintenance levels are
covered in this chapter.
Section II.
WINTERIZATION KITS
19-3. HOT WATER PERSONNEL HEATER KIT INSTALLATION, TEST, AND
ADJUSTMENT.
N o special tools required
TOOLS:
H o t water personnel heater kit.
SUPPLIES:
PERSONNEL:
One
EQUIPMENT
CONDITIONS:
T r u c k parked, engine off, handbrake set.
a.
P r e l i m i n a r y Procedures.
(1) Remove negative and positive battery cables, Refer to TM 9-2320-211-20.
(2) Open hood and left side panel. Refer to TM 9-2320-211-10.
b.
Installation.
( 1 ) Install hot water personnel heater kit using instructions that come with
the kit.
(2) Close hood and left side panel. Refer to TM 9-2320-211-10.
(3) Replace positive and negative battery cables. Refer to TM 9-2320-211-20.
c.
T e s t and Adjustment.
R e f e r to TM 9-2320-211-20.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |