Click here to make tpub.com your Home Page

Page Title: FRAME 3
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
FRAME 3
1.
P u t gasket (1) and cover (2) in place.
Put in four screws (3) and lockwashers (4).
2.
Press seal (5) into cap (6).
3.
P a c k inside of cap (6) with grease.
4.
P u t gasket (7) and cap (6) with seal (5) in place.
5.
P u t in four screws (8) and lockwashers (9) .
6.
7.
F a s t e n dial indicator to housing (10) so that plunger of dial indicator is against
e n d of input shaft (11) as shown.
P u s h in and pull out input shaft (11) to check that end play is between 0.010
8.
i n c h and 0.033 inch.
T a k e off dial indicator.
9.
10.
I f end play is not within limits given in step 8, do steps 11 through 14. If
end play is within limits given, go to frame 4.
T a k e out four screws (8) and lockwashers (9) .
11.
12.
Take off cap (6) with seal (5) .
P u t cap (6) with seal (5) back in place.
Put on another gasket (7) .
13.
Do steps 6 through 13 again until end play is within given limits.
14.
GO TO FRAME 4
17-751

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business