|
|
TM 9-2320-211-34-2-3
FRAME
3
1.
Put two spacers (1) in place inner boom (2) and push two screws (3)
through inner boom and spacers.
2.
Put two nuts (4) onto screws (3).
Hook up chain sling and chain hoist to crowd cylinder assembly (5).
3.
Soldiers
4.
Using chain sling and chain hoist, raise crowd cylinder assembly (5)
A and B
and guide it into place in inner boom (2).
Soldier C 5.
Aline bore in piston rod (6) with bore in inner boom (2). Push in
pin (7).
Put in cotter pin (8).
6.
7.
Take off chain sling and chain hoist.
8.
Push crowd cylinder (5) all the way into inner boom (2).
NOTE
Follow-on Maintenance Action Required:
R e p l a c e inner boom in outer boom. Refer to para 17-45.
1.
R e p l a c e boom assembly. Refer to para 17-44.
2.
R e p l a c e hoist winch cable. R e f e r to TM 9-2320-211-20.
3.
O i l and grease boom assembly. Refer to
4.
L O 9-2320-211-12.
5.
Adjust crane inner and outer boom rollers. Refer
to TM 2320-211-20.
END OF TASK
17-598
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |