|
|
TM 9-2320-211-34-2-3
FRAME 2
Put two sheave bushings (1) into two sheaves (2).
1.
Put sheaves (2) with sheave bushings (1), two thrust washers (3), and flat washer (4)
2.
in place in inner boom (5).
Push in pin (6).
3.
Put in cotter pin (7).
4.
Put in lubrication fitting (8).
5.
GO TO FRAME 3
17-597
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |