|
|
TM 9-2320-211-34-2-3
FRAME 5
1.
P u t two bushings (1) in roller tube (2).
2.
S l i d e roller tube (2) with bushings (1) and two hangers (3) onto
r o l l e r tube shaft (4), and line up holes for cotter pin (5).
3.
P u t in cotter pin (5).
4.
P u t in lubrication fitting (6).
Soldier A 5.
H o l d hoist winch roller tube assembly (7) in place on outer boom (8)
Soldier B 6.
P u t in four screws and locknuts (9), two on each side of outer boom
(8) and tighten.
7.
D o steps 1 through 6 again on other hoist winch roller assembly (10)
GO TO FRAME 6
17-585
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |