|
|
TM 9-2320-211-34-2-3
FRAME 4
Hook up chain sling and chain hoist (1) to hoist winch assembly (2).
1.
Soldier A 2.
Raise hoist winch assembly (2) into position.
As soldier A raises hoist winch assembly (2), hold support (3) and guide
Soldier B 3.
it into position.
Put in six screws and lockwashers (4).
4.
Soldier A 5.
Put in six screws and lockwashers (5).
Take chain sling and chain hoist (1) off hoist winch assembly (2).
6.
7.
Take caps off tube assemblies (6 and 7). Put tube assemblies into
elbows (8 and 9) as tagged.
Take tags off tube assemblies (6 and 7).
Tighten two fittings (10).
8.
GO TO FRAME 5
17-584
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |