|
|
TM 9-2320-211-34-2-3
FRAME
2
Soldier A 1.
Using two pieces of l/2-inch rope, tie two slings (1) around oil reservoir
(2) as shown.
2.
Hook up chain hoist (3) to rope sling (1).
3.
Tie guide line (4) to rope sling (1).
Guide oil reservoir (2) from ground, watching soldier A.
Soldier B 4.
Soldier A 5.
Using chain hoist (3), raise oil reservoir (2) up onto wrecker body (5).
Soldier B 6.
From truck, guide oil reservoir (2) into position on wrecker body (5).
Take off hoist (3) and rope sling (1).
GO TO FRAME 3
17-498
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |