|
|
TM 9-2320-211-34-2-3
FRAME 5
1.
S l i d e packing (1) and gland (2) down piston rod (3) and into place in
cylinder head (4).
2.
L i n e up bolt holes and put in three bolts (5) and lockwashers (6).
3.
T i g h t e n bolts (5) to 35 pound-feet.
END OF TASK
17-314
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |