|
|
TM 9-2320-211-34-2-3
FRAME 3
Put in two keepers (1), springs (2), and bolts (3).
1.
2.
P u t on two washers (4) and nuts (5).
P u t in two cotter pins (6).
3.
D o steps 1 through 3 again on right side of truck.
4.
NOTE
F o l l o w - o n Maintenance Action Required:
1.
Replace control valve. Refer to para 17-21.
2.
R e p l a c e hoist hydraulic cylinders. Refer to
3.
R e p l a c e hoist roller arms. Refer to para 17-28.
4.
Replace dump truck body. Refer to Part 2,
para 16-28.
5.
Replace hoist control linkage. Refer to para 17-22.
6.
F i l l hydraulic system. R e f e r to LO 9-2320-211-12.
END OF TASK
17-301
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |