|
|
TM 9-2320-211-34-2-2
b.
Removal.
FRAME 1
Soldier A
1.
H o o k two point chain sling (1) under front corners of body (2) and
t o hoist equipment as shown.
2.
R a i s e hoist equipment when soldier B raises dump body (2).
Soldier B
3.
R a i s e dump body (2). Refer to TM 9-2320-211-10.
4.
R a i s e two safety braces (3) into locked position as shown.
Soldier A
5.
L o w e r hoist equipment when soldier B lowers dump body (2) onto
safety braces (3).
Soldier B
6.
Lower dump body (2) onto safety braces (3). Refer to Hoist Brace
L o c k i n g and Unlocking, TM 9-2320-211-20.
Soldiers
7.
Remove both hoist roller assemblies (4). Refer to Part 3, para 17-28.
A and B
Soldier A
8.
S t a n d at outside of cylinder (5).
Soldier B
9.
S t a n d at outside of cylinder (6).
Soldiers
10.
L i f t up cylinder (5 and 6) at the same time. Slide out wood block
A and B
(7) and carefully lower cylinders.
Soldier A
11.
U s i n g hoist equipment, raise dump body (2) to take weight off two
safety braces (3).
Soldier B
12.
Lower two safety braces (3).
Soldier A
13.
U s i n g hoist equipment, lower dump body (2).
Soldier B
14.
Take off two-point chain sling (1).
GO TO FRAME 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |