Click here to make tpub.com your Home Page

Page Title: CHAPTER 21. MAINTENANCE OF MATERIAL USED IN CONJUNCTION WITH MAJOR ITEMS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-203-2
MAINTENANCE OF MATERIAL USED IN CONJUNCTION
WITH MAJOR ITEMS
Section I. SCOPE
21-1. EQUIPMENT ITEMS COVERED.  This chapter gives equipment maintenance
procedures for winterization kits, deep water fording kit, and special purpose kits
for which there are authorized corrective maintenance tasks at the organizational
maintenance level.
21-2. EQUIPMENT ITEMS NOT COVERED.  All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in
this chapter.
Section II.
WINTERIZATION KITS
21-3. PERSONNEL HEATER ELECTRIC FUEL PUMP REMOVAL, REPLACEMENT,
AND TEST.
WARNING
Smoking, sparks, or open flame are not allowed
within 50 feet of work area during this task.
TOOLS:
General mechanic tool kit
Flat-tip screwdriver
6-inch pliers
1/2-gallon container
Solvent, dry cleaning, type II (SD-2), Fed. Spec P-D-680
SUPPLIES:
Fuel pump cover gasket
Fuel pump cup gasket
Rags
PERSONNEL:
Two
EQUIPMENT
CONDITION: Truck parked, engine off, handbrake set.
a.
Preliminary Procedures.
(1) Disconnect battery ground cable. Refer to Part 1, para 7-44.
(2) Turn off personnel heater, powerplant heater, and shutoff cocks. Refer
to TM 9-2320-211-10.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business